Mamut (export)

Modified on Thu, 5 Nov at 12:09 PM

How the export works

With the Mamut export, Project Flow creates a file with your finalized invoices and credit notes, as vouchers, that you import into Mamut (Visma). The file uses Mamut's standard import format GBAT10, which many other accounting systems can also read. It is a file export, not a live connection.

  • What is exported: invoices and credit notes. The customer's number, name and address are on each line, but customers and projects aren't exported as separate records.
  • How the file gets to Mamut: you download it, or Project Flow sends it by email, FTP/SFTP or HTTP.
  • When: when you run the export, or automatically after each invoice is finalized (FTP and HTTP only).

Duett (Mamut) creates exactly the same file, for Duett customers.



Set up the export

Step 1: Add the integration

  1. Go to Setup → Settings → Integrations (Oppsett → Innstillinger → Integrasjoner) and switch to the tab Export to file (Eksport til fil). You need administrator access.
  2. Click + Create integration and choose Mamut.
  3. Fill in the fields below, tick Enabled and save.

Project Flow plan. The export isn't available on the Start plan.


Step 2: Mamut settings

Field (EN / NB)Description
Project number / RegnskapsprosjektWhether and how the project is sent: don't export project number (default), export project number from project, or export project number from tag in tag group.
Project tag group / Prosjekt taggruppeOnly for the tag group option. The code of the project's tag in this group is sent as project number. Choose a group, otherwise the project column is empty.
Voucher code for invoice / Bilagsart for fakturaerThe voucher type for invoices. Default 1.
Voucher code for credit notes / Bilagsart for kreditnotaerThe voucher type for credit notes. Default 3.

Project from project or tag? Every invoice must then have a project.


Step 3: How and when the file is sent

Field (EN / NB)Description
Default invoice issue date limit / Standard sluttdato for fakturaeksportWhich invoices are included, by invoice date: Up to and including last day of previous month, Current date, or No limitations on date (everything that hasn't been exported yet) (default).
Send data to / Send data tilDownload folder (default), Email, FTP / FTPS (also SFTP) or HTTP / HTTPS.
Transfer files / Send over filerOnly for FTP and HTTP. Manually (default), or Continuously (after each invoice finalization).
Define access / Definer tilgangOnly for manual transfer. Limit who may run the export, by access role or coworker.


Step 4: Prepare Project Flow and Mamut

  • Account numbers: the account number on each bookkeeping account must exist in Mamut. The customer line always uses account 1510.
  • VAT codes: fill in the Mamut VAT code in Accounting VAT code (Regnskap MVA kode) on each bookkeeping account. Mamut uses it to calculate the VAT from the gross amount. If it is empty, the VAT code is empty in the file.
  • In Mamut: the accounting year and period, and the departments and projects used, must exist before you import.
  • No semicolons in names. The file uses ; as separator, so a customer name or address with ; moves the columns.



Run the export

  1. When there are invoices to export, Export to accounting (N) (Eksport til regnskap) appears in the notifications menu (the bell). You need permission to edit invoices, and must be on the access list if one is defined.
  2. Click it, check the Invoices to be exported, and choose an Until date if your date limit allows it.
  3. Click Export (Eksporter). You see "Data export succeeded". With Download folder, the file is downloaded right away.
  • Which invoices: finalized invoices and credit notes with the export status To transfer and an invoice date within the date limit, in invoice-number order.
  • After the export: the invoices get the export status Has been transferred (Har blitt overført).
  • Export again: in the invoice overview, open the cog menu, choose Edit export status for several invoices, set the invoices back to To transfer, and run the export again.
  • Earlier files: in the invoice overview, open the cog menu and choose Exported files (Eksporterte filer).



The file

The export is a GBAT10 file:

  • A .csv file, separated by semicolons, with no header row.
  • Encoding ISO-8859-1, Windows line breaks.
  • Dates as YYYYMMDD, amounts with 2 decimals and a period as decimal separator.
  • The file name ends with -mamut.csv.

Lines for each invoice:

  • One customer line on account 1510, with the invoice total including VAT.
  • One line per bookkeeping account used on the invoice, with the amount including VAT as a negative amount. Invoice lines on the same account are added together, and text lines are left out.
  • A rounding line on the rounding account, if the invoice is rounded.

Credit notes have the same lines with the opposite signs, and the voucher code for credit notes.

VAT. All lines are marked as gross amounts (Gross = T), so Mamut calculates the VAT from the gross amount and the VAT code on each line.

Column (from 0)Content
0GBAT10
1 Voucher no.Invoice number
2 Voucher dateInvoice date
3 Voucher typeThe voucher code for invoices (default 1) or credit notes (default 3)
4 Period, 5 Accounting yearMonth (1–12) and year of the invoice date
6 Account1510 on the customer line; the account number on the other lines
7 VAT code1 on the customer line; the account's Accounting VAT code on the other lines
8 Balance, 27 GrossSumThe amount including VAT, in your company currency
9 Customer no., 11 ContactCustomer number and name
12–14Customer address, postal code and postal place
15 Invoice no.Invoice number
16 KID, 17 Due date, 19 Bank accountFrom the invoice
20, 21 DescriptionThe customer name. For invoices in another currency, the customer line also shows the currency and the amount in that currency.
22 Interest invoicing1 (no interest invoicing)
23 ProjectAccording to the Project number setting
24 DepartmentThe invoice's department: Department number in external system, or the department number
26 GrossT

Empty columns: supplier no. (10), 18 and payment terms (25).



Continuous transfer

With FTP or HTTP and Continuously (after each invoice finalization), Project Flow sends a file for each invoice as soon as it is finalized.

  • No bell entry. The export entry in the notifications menu isn't shown in this mode.
  • Status before upload. The invoice can get the status Has been transferred before the upload is done. If the upload fails, it is only shown in Company → Logs, with a link to download the file. Check the log regularly.



Q&A

Q: Mamut calculates the wrong VAT.

A: Check the Accounting VAT code on the bookkeeping accounts used on the invoice. It must be the VAT code in Mamut.

Q: Can I use another customer account than 1510?

A: No. The customer line always uses account 1510.

Q: The project column is empty.

A: Check the Project number setting. With the tag group option, a tag group must be chosen, and the project must have a tag in that group.

Q: The import fails on period or department.

A: The accounting year, period and departments must exist in Mamut before the import.

Q: I need to export an invoice again.

A: Set its export status back to To transfer with Edit export status for several invoices, and run the export again. Or download the earlier file from Exported files.

Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select at least one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article